
Village of Manorhaven Building Permits
Get your permit filed or your violation fixed. Free quote.
Manorhaven is a village in the Town of North Hempstead, and permits go to the Village. The Village's rule: no construction work on Saturdays, Sundays or holidays.
Village of Manorhaven Building Department (not us)
- Address
- 33 Manorhaven Boulevard, Port Washington, NY 11050
- Phone
- 516-883-7000
- Hours
- Monday–Friday, 8:30am–4pm.
- Permit portal
- None. Applications are filed on paper with the Inspection Section.
- Permit rules
- Building Department: when you need a permit
- Local code
- Code of the Village of Manorhaven
- Forms
- Village forms
How Filing Works in Manorhaven
- Silt fence firstSilt fencing or hay bales must be in place before the permit.
- Plans and surveysTwo sets of quarter-inch plans and two current surveys.
- Flood zonesA FEMA Elevation Certificate in flood zones, plus soil borings.
- InsuranceLicenses, workers' comp and liability naming the Village.

Selling your house? Close your open permits first.
How We Help in Manorhaven
- Waterfront lots. We answer the FEMA and Coastal Zone questions and check the fill rule.
- We follow the board order, from the Zoning Board to the Planning Board to the ARB.
- We're there for inspections, since the owner, contractor, architect or agent must attend.
Decks, fences, sheds and pools: about 2–4 weeks. Other jobs: about 4–8 weeks on average.* It varies by village and scope.*Typical time is based on an average job in the Village of Manorhaven, assuming no extra work or construction needs to be done and the building department accepts the permit application.

Manorhaven Permit Questions
What work needs a permit in Manorhaven?
The Village lists pools, aprons, decks and patios, demolition, driveways, fences, finished basements, fireplaces, hot tubs and spas, additions and interior alterations, new homes, heating units and tanks, plumbing, pods, dish antennas, retaining walls, sheds, sidewalks and curbs, signs, temporary structures, tennis courts, tree removal and changes of use.
Source: Village of Manorhaven: Building Department (opens in a new tab)
What order do the boards go in?
First the Building Department approves or denies. A denial letter sends the job to the Zoning Board. Next comes Planning Board site plan review, then the Architectural Review Board, depending on the size of the project. Final plans go back to the Building Department. Subdivisions go to the Planning Board first.
Source: Village of Manorhaven: Building Department (opens in a new tab)
What does the Zoning Board need?
Three sets of signed and sealed presentation drawings (working drawings are not accepted), the denial letter, and a plot plan with elevations at the road crown, footing, foundation and corners.
Source: Village of Manorhaven: Building Permit Application (PDF) (opens in a new tab)
My home is in a flood plain. Anything extra?
Bring a FEMA Elevation Certificate. If fill is brought onto the site, the job needs Planning Board approval under Chapter 72 of the Village Code.
Source: Village of Manorhaven: Building Permit Application (PDF) (opens in a new tab)
How long is a Manorhaven permit good for?
Work must start within 6 months and finish within one year, or the permit must be renewed before it expires.
Source: Village of Manorhaven: Building Permit Application (PDF) (opens in a new tab)
Do I need a license to rent out my home?
Yes. Manorhaven has a rental housing license, with a property inspection list. We don't file rental permits; this is for your information.
Source: Village of Manorhaven: Village forms (opens in a new tab)

Call or text us and we'll take your details by phone.
Hours
- Monday
- 8:30am–8:30pm
- Tuesday
- 8:30am–8:30pm
- Wednesday
- 8:30am–8:30pm
- Thursday
- 8:30am–8:30pm
- Friday
- 8:30am–8:30pm
- Saturday
- Closed
- Sunday
- Closed
After-hours and weekend messages are answered the next business day.
Prefer to talk? Call or text 516-399-0139.




