Skip to main content
Nassau County Expeditors, home

Village of Cedarhurst Building Permits

Get your permit filed or your violation fixed. Free quote.

4.6on Google (11 reviews). Opens our Google listing.

Cedarhurst is a village in the Town of Hempstead, and permits go to the Village. The Village's rule: every permit is filed in two copies, with the county assessor's sheet.

Village of Cedarhurst Building Department (not us)

Address
200 Cedarhurst Avenue, Cedarhurst, NY 11516
Permit portal
Paper filing, two copies of each form. The Village's Municity (City Squared) portal shows permit history.
Permit rules
Building Department

Village of Cedarhurst Building Permit Fees

A building permit for a one- or two-family house in Cedarhurst costs $250 for the first $1,000 of construction cost, plus $17 for each additional $1,000.

Fees charged by the Village of Cedarhurst Building Department
PermitFee
Building permit, 1 and 2 family$250 for the first $1,000 of cost, plus $17 per additional $1,000
New 1 and 2 family house$3 per sq ft (1st and 2nd floor), $2 finished cellar, $1 unfinished cellar
Certificate of occupancy or completion, 1 and 2 family$200
Fence$45
Pool$500 under 10,000 gallons, $1,000 over
Demolition$1,000

Source: Village of Cedarhurst: Permit Fees. Checked .

How Filing Works in Cedarhurst

  • Full setBuilding, plumbing, electrical and HVAC forms plus the assessor's sheet.
  • Two copiesEvery form is handed in twice, on legal-size paper.
  • Flood zoneThe application asks for your FEMA zone and flood elevation.
  • BoardsARB on the 3rd Wednesday, zoning on the 4th Thursday.

Selling your house? Close your open permits first.

How We Help in Cedarhurst

  • House lifting. We assemble the elevation certificates, energy calculations and fence plan.
  • Tall fences and hedges. Anything over 3 feet goes to the ARB, and we prepare it.
  • Need a variance? We refer you to a zoning/land-use attorney and keep the permit moving.

Decks, fences, sheds and pools: about 2–4 weeks. Other jobs: about 4–8 weeks on average.* It varies by village and scope.*Typical time is based on an average job in the Village of Cedarhurst, assuming no extra work or construction needs to be done and the building department accepts the permit application.

Rolled blueprints and a permit folder on a pickup tailgate in front of a home renovation

Cedarhurst Permit Questions

What needs a permit in Cedarhurst?

The Village has permit forms for building, plumbing, electrical and HVAC work, generators, demolition, house lifting, mother/daughter conversions, fences and hedges, sidewalks, oil and gas tanks, street openings, signs and awnings, tents, and pods or dumpsters.

Source: Village of Cedarhurst: Permits & Licenses (opens in a new tab)

What does it take to lift my house?

Two sets of stamped drawings with a zoning analysis, a notarized application, two surveys from the last 10 years, two elevation certificates, energy (ResCheck) calculations, the trade permits, the contractor's license and insurance, and a site plan for temporary fencing.

Source: Village of Cedarhurst: House Lifting Checklist (PDF) (opens in a new tab)

When does the Architectural Review Board meet?

The third Wednesday of each month. It reviews the outside of buildings in business and multiple-dwelling zones, and any fence or planting over 3 feet.

Source: Village of Cedarhurst: Architectural Review Board (opens in a new tab)

How long is a Cedarhurst permit good for?

Work has to start within 6 months. The permit expires 12 months after it's issued and can be renewed.

Source: Village of Cedarhurst Code, Ch. 3 (opens in a new tab)

When can contractors work?

Weekdays 8am–6pm. No outside work on weekends or legal holidays, and inside work only 9am–6pm on those days.

Source: Village of Cedarhurst: Building Department (opens in a new tab)

Do I need a permit to rent out my home?

Cedarhurst has a rental permit application for rental units. We don't file rental permits; this is for your information.

Source: Village of Cedarhurst: Rental Permit Application (PDF) (opens in a new tab)

History of Building Codes

Call or text us and we'll take your details by phone.

Hours

Monday
8:30am–8:30pm
Tuesday
8:30am–8:30pm
Wednesday
8:30am–8:30pm
Thursday
8:30am–8:30pm
Friday
8:30am–8:30pm
Saturday
Closed
Sunday
Closed

After-hours and weekend messages are answered the next business day.

Prefer to talk? Call or text 516-399-0139.

Privacy Policy · SMS Terms